Before, during, and after! Futurefabs Ltd. designed, fabricated, and installed sixteen new galvanised and wet painted balustrade panels to replace the existing brickwork. At nearly half a tonne each, there certainly were some logistical challenges for us, but with our highly experienced team and well chosen equipment for the task, we delivered this project on time and within budget.